Status Tech navigation and website tiers
LANDSCAPE ARCHITECTURE
Index
C-27 BIDDING · 6 MIN READ

How to Compare Three California C-27 Landscape Contractor Bids Without Getting Burned on Change Orders

Why one contractor bids $38,000 while another bids $74,000 for the exact same yard—and the five line items our 1/4" = 1'-0" plans lock down before construction starts.

01

Why two C-27 bids vary by $30,000 on the same yard

When homeowners ask contractors to "price a stone patio and native plants" without a scaled plan, Bidder A assumes 2 inches of sand and 1-gallon starter plants while Bidder B prices 6 inches of compacted clean rock, perimeter drains, and mature 24"-box olive trees. Comparing lump-sum totals without locked specs guarantees expensive mid-build change orders.

Architectural overview of a completed courtyard garden showing crisp hardscape and planting zones
Fig 02. Clean square-footage takeoffs eliminate ambiguity across paving, crushed basalt, irrigation zones, and perimeter lighting.Turnkey Stewardship · Bid Control
02

Five specifications Fieldwork locks down before bidding

Because Fieldwork stays independent of construction markups, our drawings exist strictly to protect your design intent and budget:

  • Exact stone quarry, finish, and thickness (e.g., 2" honed limestone vs. thin 3/4" veneer).
  • Sub-base excavation depth, haul-away tonnage, and geotextile separation fabric.
  • Dedicated irrigation valve manifold count, pressure regulators, and smart timer model.
  • Exact plant botanical Latin names and nursery container sizes (1-gal, 5-gal, 15-gal, 24"-box).
  • Low-voltage transformer wattage and brass fixture part numbers rather than generic plastic path lights.
Hidden Cost Audit: Where Unclear Landscape Bids Diverge Most
Line ItemVague Lump-Sum Bid RiskFieldwork Locked CAD Specification
Excavation & Haul-OffExcluded or billed "time & materials"Cubic-yard soil export volume called out upfront
Paving Sub-Base2" sand (sinks in 1 winter)6" clean 3/4" crushed rock + Mirafi 140N fabric
Plant MaturityTiny 1-gal pots taking 5 yrs to fillExact mix of 1-gal, 5-gal, 15-gal & specimen boxes
Lighting HardwarePowder-coated aluminum that corrodesSolid cast-brass 2700K dark-sky fixtures
Clean modern residence arrival threshold with crisp stonework and ornamental olive
Bid Scope AArrival Spec · Dimensioned risers and flush walkway bands bid cleanly.
Completed Mediterranean limestone courtyard with mature specimen olives
Bid Scope BWholesale Tagging · Hand-selected trees lock beauty before delivery.

“Spending $1,080 on scaled architectural plans routinely saves $8,000 to $15,000 in competitive C-27 bidding and prevents every surprise change order.”

Daniel Brooks · Principal Landscape Designer
FREQUENTLY ASKED QUESTIONS

Common Bay Area site questions

Are Fieldwork plans detailed enough for licensed California C-27 contractors to bid directly?

Yes. Every Planting Plan and Master Concept is drafted to 1/4" = 1'-0" architectural scale with exact stone square footage, aggregate sub-base depth, lighting wattage loads, and nursery container counts.

Does the $85 on-site architectural walk credit toward design fees?

Yes. Your $85 walkthrough fee credits 100% toward any Planting Plan, Commission Bundle, or Full Yard Master Concept commissioned within 60 days of our visit.

Do you coordinate with EBMUD, SFPUC, and Marin Water turf-replacement rebate guidelines?

Yes. We prepare scaled WUCOLS Low/Very-Low water plant tables and 30 PSI inline drip hydrozone sheets formatted for pre-inspection submission before turf removal.